Complete finished product coming very soon. Ship was basically snatched from the bone yard and refurbished back to state of the are vessel for technical work. Earning capacity of the vessel went to one hundred seventy five thousand dollars a day on a capital investment of about 26 million including purchase and upgrades.
Specific Project: Complete refurbishment of a vessel now named the GGS Atlantic. The vessel was brought from ABS “laid up” status to a full working seismic vessel. All seismic gear was added while the vessel was being refurbished. The GGS Atlantic has produced admirably since being taken back out on the job from Freeport, Texas. The vessel has traveled to India, the middle east and back to the Gulf with a side trip to South America and Trinidad. The vessel was used on both Multi Client and single client contracts. Time involved for project from purchase to launch was one year at a competitive cost. Project endured shipyard labor strikes and some weather threats.
Vessel at Begining of Project
Vessel had been “laid up” at time of purchase. The as is – where is purchase was towed to Texas and the work began
Vessel in dry dock (pictured aft one third) for complt refurbishiment, including steel overhaul to tanks. All Class and necessary certificates were brought to current status. More of this description to be added.
Refurbished Vesselwiting for last minute add ons
Vesselworking international